Building type
Office building
Scope of services
General planning
Location
St. Pölten
Client
TOSACO GmbH
Construction costs excl. tax
3.2m €
Project period
2017 – 2018
Status
Completed
büro papier salzer
büro papier salzer

About

Sustainable and flexible building based on a modular system.
On the site of the Salzer paper mill in St. Pölten, a new 3-story office building was erected according to our design in timber frame construction based on the modular system of the company Lukas Lang Building Technologies GmbH. The modular system consists of industrially prefabricated components that are assembled into individual buildings. The objects can thus be flexibly and sustainably expanded, modified or dismantled for relocation at any time. The total construction time was only 6 months due to the efficiency of the modular system. (Photos © Kurt Hörbst)