preliminary design, design development, submission planning, execution planning, tendering, participation in the allocation procedure, on-site supervision
Standort
Baden (AT)
Region
National
Client
HOSPES – Grundstücksverwaltungs Gesellschaft m.b.H
Total project costs
24.3 Mio. €
Construction costs excl. tax
221 Mio. €
Projektstart
2007
Completion period
2007-2017
Departements
emergency unit with preadmission area, outpatients unit, endoscopy, laboratory, radiology, operation theatre, delivery, physical therapy, occupational therapy, wards, dialysis, ward – psychological diseases, dayclinic
Gross floor area
45.000 m²
The NÖ Landeskliniken Holding build under the slogan „One hospital – two locations” the hospital Baden/Mödling. This new construc-tion ensures the medical service of the whole north thermal region and offers extensive and modern medical service in 21th century, which satisfied the needs of the patients and creates new jobs.
The location Baden complies with 443 beds all tasks of a hospital center and contains all necessary departments to guarantee the optimum medical service of the patients. Access to the hospital ensued via southern entrance, where the three towers can be reached by the elevator elements. In addition there is an emergency access which is used for lying patients and for the emergency medical service.