general planning, project management, on-site supervision in cooperation with Arch. Prof. Lintl ZT GmbH
Standort
Bad Häring (AT)
Region
National
Client
AUVA, Allgemeine Unfallversicherungsanstalt, Adalbert Stifter Straße 65, A-1200 Wien
Total project costs
€100 Mio.
Projektstart
2002
Completion period
2002-2011
Gross floor area
36.400 m²
Clear structures together with warm elements provide emotional security and privacy.
The renewal and extension took place in four stages of construction during operation, where a separate temporary building for the patient ward was created. All areas except for the patient‘s ward have been completely rebuilt.
Functionality and comfort in line.
The aim was to give the rehabilitation center a functionality and a cozy and human atmosphere at once. To limit the heteronomy of the patient to the basics and to create maximum individual area, was the basic idea, the Moser Architects pursued it.
The indoor swimming pool.
As in all other areas, there are connections to nature. The tiles on walls and floors reflect the idea of a variety of water drops.