Sanatorium Hera

Building type
Sanatorium
Scope of services
general planning
Standort
Vienna (AT)
Region
National
Client
Krankenfürsorgeanstalt der Bediensteten der Stadt Wien
Construction costs excl. tax
19,43 Mio. €
Projektstart
2010
Completion period
2010-2013

Reconstruction during operation.

The Sanatorium Hera consists of six buildings of differing age and condition and was converted several times in the past. As the project was based on the existing fabric of the building, there were only minor conversion measures affecting its structure. The planned measures were based on operational requirements and followed the BO-Concept. Thus, the primary focus was on the re-allocation of spaces and new operational organization of the hospital’s medical functions.
© 2018 Moser Architects, Moser Health Care, Moser Development, Moser International